国产伦子伦对白视频,91精品国产日韩91久久久久久,安微BBB桑BBB桑BBB,亚洲成人无码AV,亚洲成a人片7777777影片

Stainless steel pipe making machine stainless steel pipe welding machine

Productrealmap:Productdetails1.StainlesssteeldecorativepipecontrolmachineThestainlesssteeldecorativepipemachineismainlyusedfortheproductionofstainlesssteelpipesandcarbonsteelpipesfordecoration,product

Product real map:


1869497355_753290084.jpg


Product details

1. Stainless steel decorative pipe control machine

The stainless steel decorative pipe machine is mainly used for the production of stainless steel pipes and carbon steel pipes for decoration, products, household appliances, etc. The products produced by this series of moulds are round, square and rectangular pipes, as well as elliptical, semi-circular and plum-blossom pipes. Such as: stainless steel staircase handrails, burglar proof doors and windows, electric heating pipes, housing leakage pipes, etc.


2, automated production process:

Through the continuous forming process of uncoiling, feeding guidance, marking, forming, welding, external weld grinding, shaping and sizing, sizing, cutting (coil), jointing, etc., the structure is fine and the operation is simple.


3. Product characteristics: the machine is strong, durable, high precision, fully automated, simple to operate, continuous production, high efficiency, less waste of materials, high yield, low production cost.


4, technical parameters:

Model

(mm)

(mm)

(mm) 

(mm) 

Power

L*W(m) 

Basic specification for pipe making machine

met-30

 30

 20

Φ5-Φ25

 0.25-0.8

 5.5KW

 19.5*1.0m

met-S40

 40

 25

Φ6-Φ40

 0.25-1.2

 5.5KW

 20*1.0m

met-40

 40

 25

Φ9.5-Φ50.8

 0.25-2.0

 7.5KW

 21.5*1.1m

met-40L

 40

 25

Φ12.7-Φ63.5

 0.25-2.0

 11KW

 21.5*1.1m

met-50 

 50

 30

Φ25.4-Φ76.2

 0.4-2.5

 15KW

 24*1.2m

met-60

 60

 40

Φ50.8-Φ114

 0.7-3.0

 18.5KW

 26*1.4m

met-80

 80

 50

Φ76-Φ168

 1.0-4.0

 36.5KW

 32*2.3m

met-100

 100

 70

Φ114-Φ219

 1.5-4.5

 45KW

 36*2.5m

Operational considerations:

1, ensure smooth production and meet product requirements.

1.2 effective maintenance of equipment.

1.3, write reasonable operation instruction procedures to ensure the production plan and product quality achieve the desired goals.

2, scope of use:

Workshop management department.

3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2 accurately control the operation of the machine before shift and coordinate with normal production. Pay attention to the opening of water, gas or electricity, grinding the wheel, saw blade and cutting table.

4, boot:

4 before starting, according to the lubrication requirements, injecting different lubricants to the parts where the lubricating oil is required to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2 Check whether the mechanical parts and pneumatic system are normal or not. If there are abnormal phenomena, they should be checked and eliminated in time so as not to cause mechanical equipment accidents.

4.3 Check the transmission gear is correct, otherwise there will be quality problems, whether the pressure gauge of the cutting machine reaches 0.5-0.7 mpa, otherwise it can not be cut.

4.4 Let the motor run empty for 2-3 minutes before going to work every morning. The transmission gears are equal to 0. When driving, the operator is not allowed to leave the machine tool and do other irrelevant things.

4.5 it is strictly prohibited to wear gloves to boot, long sleeved clothes must wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8 during the operation, you are not allowed to leave the machine tool. You are not allowed to do other irrelevant things, and pay attention to whether the welds are normal.

4.9 In the process of pipe-making, the cutting strip must be consented by the workshop director, stored in the belt-laying area, and recorded in detail with the sling operator on the Production Process Card. It must not be discarded at will.

4.10 If abnormal phenomena are found in operation, such as smoke, burning odor, sudden fuse burning, sudden extinguishment of indicator lights and timely switching off the power switch to be checked out, then turn on operation after troubleshooting.

4.11 the product's length is checked regularly, not more than 6.01 meters, not less than 6 meters. Strictly controlled between 4mm. The pipe on the unloading pipe rack should not exceed 95% of the total capacity, so that the flat mouth personnel should be lifted in time, otherwise the operator will be responsible for the damage.

5, downtime:

5.1 stop welding while closing the power supply.

3

4

5

6


国产美女裸体永久免费 | 日本丰满无码一区久久 | 中文字幕人妻丝袜二区在线 | 欧美成人精品免费17c | 无码 无码 无码 嗯嗯 啊吧 | 久久国产精品激情对白 | 91精品无码少妇a 6 2v蜜桃 | 精品人妻一区二区三区缅甸 | ww.777色情网免费视频 | 农村婬乱生活A片1一15 | 91av视频在线观看 | 欧美一乱一性一交一视频 | 欧美丰满熟妇BBB久久久 | 老头天天吃我奶躁我的动图 | 国产一级毛片在线视频 | 少妇精品无码一区二区免费视频 | 特级精品毛片免费观看 | 先锋影音视频美女水多嫩后入 | 91麻豆产精品久久久久久 | 欧美精产国品一二三区 | 四川少妇BBBBBB爽爽爽欧美 | 国产91熟女按摩泄火熟女 | 91AV网站在线观看 | 久久久久久免费一级A片 | 国产91熟女高潮一区二区 | 丰满少妇一级毛片免费观看 | 特级全黄久久久久久久久 | 91丨九色丨国产 在线 | 人人玩人人添人人澡丶 | 免费一级a一片一久久裸体 四季无码AV在线播放播放 | 九九水密桃亚洲AV无码精 | 精品国产乱码久久久久久1区2区-亚洲 | 爆乳巨大freesex国产精品 | 国产一区二区三区视频 | 国产欧美日韩无码一区二区 | 欧美日韩精品少妇极品 | 羞羞视频免费在线观看 | 无码人妻精品中文字幕 | 免费观看黄色小视频 | 久久久波德野结依AV再现! | 无码国产精品一区二区高潮 |